Careers | Contractor Login

Repair of HVAC Systems on Bradley Air National Guard Base, East Granby, CT

Home > Projects > Repair of HVAC Systems on Bradley Air National Guard Base, East Granby, CT
Agency: Department of the Air Force

Contract # W91ZRS-12-D-0016-0004

The upgrading of HVAC systems at three separate buildings simultaneously, each with different specialized piece of equipment was accomplished successfully by Classic through careful scheduling and procurement methods. The systems mentioned included large roof top units, new high efficiency boilers, a cooling tower, specialized changeover of controls to integrate seamlessly with those of the entire base system and abatement of one of the buildings.  The knowledge base of Classic personnel allowed for a successful and timely completion of this project bringing the systems online through a comprehensive commissioning process and turning over to the government updated climate controlled buildings.  Equipment upgrades of this nature require special attention to their integration with existing systems to ensure they perform together in unison. This project had a few very special challenges, one was the required quick delivery time of custom equipment and another being the integration into systems that weren’t fully functional prior to starting the project. Existing components to remain were carefully dismantled and restored to as close as possible to a like new condition ensuring that the system would remain functional and run very efficiently.